EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
C-FMSL
-
Listing for Category : lighting
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (18)
Airframe
- (4)
Avionics
- (2)
Controls
- (1)
-
Flight Controls
Empennage
Engine
- (1)
Firewall
Fuel System
- (1)
Fuselage
Inspection
Instrument Panel
- (1)
Interior Finish
- (1)
Landing Gear
Lighting
- (2)
Paint / Decals
Propeller
Research
Tail Feathers
Tools
Wings
Workshop
- (1)
Doors
- (1)
Cowl
- (1)
First Flight
- (2)
Builder Name:
Mike Lamb
-
Project:
Bede - BD-4
-
VIEW REPORTS
Total Hours:
330
Total Flight Time:
0.9
Total Expense:
$3100.00
Start/Last Date:
Jan 05, 2017 - Mar 24, 2020
Engine:
Lycoming O-320 E2D
Propeller:
Experimental
Panel:
Standard 6 pack, duel IPads.
Friendly URL:
https://eaabuilderslog.org?s=C-FMSL
Home or Last Project Picture
Nov 29, 2019
Landing gear
- (14 hours)
Category: Lighting
Bede Corp 1
0EF0E949-C934-4B3A-B123-56A9CECD40AA.jpeg
1BA9B316-0283-499F-B89D-BE8C0245025E.jpeg
1D17F412-E4EA-416D-B500-066EBD07319C.jpeg
1D8EF167-F8AB-4A85-8779-E0FAEF1ED10E.jpeg
28C3B4D3-EAC9-4929-A56F-93BBF49C3A1A.jpeg
Bede Corp 2
32E9D0FB-2293-40F6-8305-0A36F27EAE33.png
Bede Corp 3
3BFF94C8-685E-41B0-9C57-348308C58C22.jpeg
42CEE0CB-0E35-489B-863C-5746D7DBA6BB.jpeg
49ED5A5C-20FB-4638-9CAF-6370253924D4.jpeg
4E8C502F-6B2B-412B-83BB-5E612EEE0A65.jpeg
578A3F66-8D98-4193-8641-46DE8F4C2FA3.jpeg
6DBAA5AB-8558-4EBB-8246-22C925911133.jpeg
New gear fairing being developed by Bede Corp, nice.
9AF88494-352B-4A8A-B929-6427109D4BBF.jpeg
A74651EE-80E7-4F65-A5C3-D354E3C6028D.jpeg
A8415184-2570-493E-A903-2B9254CF7642.jpeg
B74EFF56-74CC-41BF-A7A1-4F48E9AB4053.jpeg
B924626C-9689-4A7E-9CDD-C3F48764B93B.jpeg
BEC4D190-8C1A-435F-826A-DD328227EED6.jpeg
D3976861-5965-46E9-82CC-AB8849A07A79.jpeg
F0058D31-8D4D-4E9B-9E9C-2CA43ADED80C.jpeg
F086D4E0-6C2F-415F-8970-92F4E060E8B2.jpeg
FAFCA4E9-1F81-4CBF-BBC1-E069406ED6F8.jpeg
Nov 29, 2019
Navigation, landing lights and nav lights
- (52 hours)
Category: Lighting
Install landing lights in both wing tips. Changed all panel lights to LEDs and repaired the nav lights. Also added a second beacon on the bottom of the fuselage.
0AD9367B-35A5-4913-BF11-14C153D405D7.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.